Back to the UT Documents page


Powerwashing first
The buildings were powerwashed, then the windows were sealed with plastic
and the trim was taped off before spray-painting continued

Being sealed in
Being sealed in!

The sidewalk was covered
The sidewalks and walkways were covered with paper,
while the edges of the buildings were taped off

Painting Building Five
Painting the trim on Building Five

Building Five is done
Building Five was completed, so work began on Building Four
Note: The stripes above the doors on Building Four were samples of potential color schemes

Painting the trim
Painting the trim on Building Four

Building Four - east side done
The completed east side of Building Four